15C, light cloud & a little rain. No wind.
The pond is half dug. I can only find 1 hour after school each day to do it- shame it isn’t done by now. Anyway, there is a use for those wretched slabs- they are now side walls awaiting the pond liner for water proofing. Today I dug out a pair of narrow troughs to anchor the edges of the slabs. There is a strange grey gravelly layer, perhaps some old tarmac from the immediate post war time that these houses were built. At this rate, the pond could be done by the weekend. Except for one thing- marking & reports. Damn.
Pingback: Pond Maintenance « Hudson's world